Presidio Coastal Trail (Completed Spring 2012)

H-beam Wall

H-beam Wall Moving Along

The H-beam wall beams have been put in place and the wall has been backfilling with gravel wrapped with fabric.

H-beam Wall Progression

We have continued with building the H-beam wall for the Presidio Coastal Trail and Golden Gate Overlook. The following pictures show our progression over the last week.

The holes for the I-beams were drilled.

 

These piles are the soil that was drilled out of the I-beam holes.

 

Construction has Begun at the Most Southern End of the Presidio Coastal Trail and Golden Gate Overlook Project

We have starting shaping the landscape for the installation of the H-beam wall.

Syndicate content