Presidio Coastal Trail (Completed Spring 2012)

Presidio Coastal Trail

The Lincoln/Merchant Connector Stairs and Behind the Golden Gate Overlook

Behind the Golden Gate Overlook everything is at finished grade and Barth's surfacing has been put down. Erosion control buttons up the area.

Box steps with Barth's surfacing has been put in leading up to the connector stairs at the Lincoln and Merchant Intersection.

Significant Progress has been made at the Presidio Coastal Trail and Golden Gate Overlook

These photos show some of the progress that has been made from Merchant Parking lot up to the Golden Gate Overlook.

Currently there is a lot of work being done at the Golden Gate Overlook. Pipes and drains are being put in and the concrete work is under way.

Presidio Coastal Trail and the Golden Gate Overlook Project Begins!

We are very excited to have begun construction on the Presidio Coastal Trail and the Golden Gate Overlook. The Golden Gate Overlook is being constructed for the celebration of the Golden Gate Bridge's 75th Anniversary in 2012! We are scheduled to complete the Overlook and Trail in April 2012.

 

Syndicate content