Presidio Coastal Trail (Completed Spring 2012)

Coastal Trail

Phase II Completed at Muir Beach

Campbell Grading, Inc has officially completed the Phase II/2010 work at Muir Beach.

This phase included (all parts were design build):

Coastal Trail Re-route + Channel Deisgn

The new Coastal Trail re-route will open this weekend!

The above image shows the Coastal Trail re-route, the installed culvert, and how the newly constructed step pools will align with the channel design to be built on the lower portion of the site (the other side of the culvert) in the next two weeks.

Syndicate content