Presidio Coastal Trail (Completed Spring 2012)

Restoration

Restoration of Phleger Estate

Campbell Grading, Inc. has moved onto the next project, restoration at Phleger Estate. This project aims to restore the forest habitat within the project area by removal of non-designated trails, stabilization of gullies, and preparation of all disturbed areas for eventual re-vegetation.

Step Pools at Muir Beach after Winter Storm

This photograph shows one of the nine step pools built on the steepest section of the upper alluvial at Muir Beach. The photo was taken the day after the big storm event on December 8th. 

Muir Beach Step Pools Completed

Campbell Grading, Inc. has completed the construction of eight step pools that were built to stabilize a large erosion gully up-stream from the Redwood Creek alluvial fan. Approximately 350 tons of rock in a variety of sizes (1/2 ton, 1/4 ton, head-size, and 3-9" rock) was used to construct the step pools.

New Muir Beach Project Featured on Wetland Podcast

Campbell Grading, Inc has begun a new project out at Muir Beach. It is a piece of the larger work on the Redwood Creek Watershed with the National Park Service and the Golden Gate National Parks Conservancy.