Presidio Coastal Trail (Completed Spring 2012)

Presidio San Francisco

El Polìn Connector Trail OPEN! Already enjoyed by wildlife.

A Cooper's Hawk is enjoying the new El Polìn Connector Trail the first day it is open. Photo taken by Amy Deck at the Presidio Trust.

Improving Draineage on the El Polin Connector

The El Polin Connector trail is wrapping up. The finishing touches include grading the slopes for improved draineage and decreased erosion.

Park Tread™ Surfacing on the El Polin Connector Trail

Park Tread™ surfacing is being installed on the El Polin Connector Trail.

 

Sutter Wall

The crew has been busy installing sutter wall at El Polin Connector Trail.

Tree Protection

Campbell Grading does not take tree protection lightly. Many trees on this section of trail are wrapped in wattles in order protect their trunks. Days of  digging by hand must be done in order to guarantee that the trees along the trail are not compromised.

New Section of the Bay Area Ridge Trail (BART) Underway in the Presidio

Work has begun on a new section of the Bay Area Ridge Trail, a 500+ mile trail planned to connect all corners of the Bay Area with a continuoes loop trail. Over 335 miles have already been constructed.

Syndicate content