By bridgett | Tue, 05/15/2012 - 06:25 |
Tags:
The Pacific Overlook is receiving its finishing touches. The concrete walls have been sandblasted and the trail has been paved with Park Tread™ surfacing.

The hand railings and Park Tread were installed on the H-beam walls.