Presidio Coastal Trail (Completed Spring 2012)

Presidio

Juan Bautista de Anza Trail Completed

 Happy New Year and happy new trail. We have completed the newest stretch of the Juan Bautista de Anza National Historic Trail that begins near the 14th Street Presidio Gate and runs to the Immigrant Point Picnic Area

 

Bay Area Ridge Trail Completed

The newest section of the Bay Area Ridge Trail (BART) is completed. It is a segment that runs from the Rob Hill Campgrounds (beginning at the end of Central Magazine Road) to Park Blvd, where it meets up with the existing multi-use (MUT) section of the BART. The trail will be a combination of MUT and outdoor accessible. The trail meanders through a beautiful serene forest.

Improving Draineage on the El Polin Connector

The El Polin Connector trail is wrapping up. The finishing touches include grading the slopes for improved draineage and decreased erosion.

Park Tread™ Surfacing on the El Polin Connector Trail

Park Tread™ surfacing is being installed on the El Polin Connector Trail.

 

Sutter Wall

The crew has been busy installing sutter wall at El Polin Connector Trail.

Syndicate content