The Battered Walls and Stairs of the Golden Gate Overlook have been poured and stripped of their forms. (This work was done by our sub-contractor, Golden Bay Construction)
We have moved to carving out the section of trail that parallels Lincoln Blvd. This is a beautiful stretch that meanders through the forest and past a wetland.