Presidio Coastal Trail (Completed Spring 2012)

September 2012

Park Tread™ Surfacing on the El Polin Connector Trail

Park Tread™ surfacing is being installed on the El Polin Connector Trail.

 

Sutter Wall

The crew has been busy installing sutter wall at El Polin Connector Trail.