Presidio Coastal Trail (Completed Spring 2012)

March 2012

Pacific Overlook Piers

The piers have been drilled,

the cages have been set,

the concrete has been poured,

and the framing of the wall is underway out at the Pacific Overlook.

Pacific Overlook Demolition

Demolition has begun on the Pacific Overlook. This project is sandwiched in at the southern end of the Golden Gate Overlook & Presidio Coastal Trail.

Overlook Walls and Stairs

The Battered Walls and Stairs of the Golden Gate Overlook have been poured and stripped of their forms. (This work was done by our sub-contractor, Golden Bay Construction)

New Trail

We have moved to carving out the section of trail that parallels Lincoln Blvd. This is a beautiful stretch that meanders through the forest and past a wetland.