Presidio Coastal Trail (Completed Spring 2012)

December 2011

Wolfback Ridge Road Improvements

Battery East Parking Lot Stockpile

Battery East Parking Lot Stockpile

 

Golden Gate Overlook Structural Slab and Formwork

The form work is underway at the Golden Gate Overlook and the structural slab for the stone has been poured.

 

Golden Bay Construction, our subcontractor, poured 117 cubic yards of concrete for the structural slab at the Golden Gate Overlook.

H-beam Wall Progression

We have continued with building the H-beam wall for the Presidio Coastal Trail and Golden Gate Overlook. The following pictures show our progression over the last week.

The holes for the I-beams were drilled.

 

These piles are the soil that was drilled out of the I-beam holes.

 

Construction has Begun at the Most Southern End of the Presidio Coastal Trail and Golden Gate Overlook Project

We have starting shaping the landscape for the installation of the H-beam wall.

The Lincoln/Merchant Connector Stairs and Behind the Golden Gate Overlook

Behind the Golden Gate Overlook everything is at finished grade and Barth's surfacing has been put down. Erosion control buttons up the area.

Box steps with Barth's surfacing has been put in leading up to the connector stairs at the Lincoln and Merchant Intersection.

Significant Progress has been made at the Presidio Coastal Trail and Golden Gate Overlook

These photos show some of the progress that has been made from Merchant Parking lot up to the Golden Gate Overlook.

Currently there is a lot of work being done at the Golden Gate Overlook. Pipes and drains are being put in and the concrete work is under way.