Presidio Coastal Trail (Completed Spring 2012)

August 2010

Muir Beach Step Pools Completed

Campbell Grading, Inc. has completed the construction of eight step pools that were built to stabilize a large erosion gully up-stream from the Redwood Creek alluvial fan. Approximately 350 tons of rock in a variety of sizes (1/2 ton, 1/4 ton, head-size, and 3-9" rock) was used to construct the step pools.

New Muir Beach Project Featured on Wetland Podcast

Campbell Grading, Inc has begun a new project out at Muir Beach. It is a piece of the larger work on the Redwood Creek Watershed with the National Park Service and the Golden Gate National Parks Conservancy.